Members of the Pavement and Equipment Team pour, distribute and level concrete May 8 near Bldg. 660 to extend a drainage area. Part of the project was completed last year, but an extension was needed to ensure proper drainage during inclement weather (U.S. Air Force Photos/Jeff Allred).
Raymond Carpenter, 90th Civil Engineer Squadron, shovels concrete May 8 near Bldg. 660. Members of the Pavements and Equipment Team were creating an extension to a drainage area.
James Munsterman, 90th CES, creates an edge on freshly poured concrete for a sewer hole during the project.